Model Pemangku Kepentingan dalam Keberhasilan Proyek

  • Herry Pintardi Chandra Fakultas Teknik Sipil dan Perencanaan, Jurusan Teknik Sipil, Institut Teknologi Sepuluh Nopember Surabaya, Kampus ITS Keputih Sukolilo 60111
  • Indarto . Fakultas Teknik Sipil dan Perencanaan, Jurusan Teknik Sipil, Institut Teknologi Sepuluh Nopember Surabaya, Kampus ITS Keputih Sukolilo 60111
  • I Putu Artama Wiguna Fakultas Teknik Sipil dan Perencanaan, Jurusan Teknik Sipil, Institut Teknologi Sepuluh Nopember Surabaya, Kampus ITS Keputih Sukolilo 60111
  • Peter F. Kaming Fakultas Teknik Sipil dan Perencanaa, Jurusan Teknik Sipil, Universitas Atma Jaya Yogyakarta, Jl. Babarsari 44, Yogyakarta 55281
Keywords: Stakeholder impact, stakeholder engagement, stakeholder psycho-logical empower¬ment, and project success

Abstract

Stakeholder condition is particularly important to reach project success. The objective of this study is to investigate the stakeholder conditions which are suggested in three parts; stakeholder impact, stakeholder engagement, and stakeholder psychological empowerment on project success. The data obtained from a questionnaire survey administered to 197 respondents for initial research, 204 for main research, and 5 construction companies for validation research by using structural equation modeling (SEM) with program AMOS 16. The results indicated that stakeholder psychological empowerment applying of the ability to perform has a significant influence on project success measured by quality performance. On the other hand, stakeholder engagement reflected by engagement scope has no significant influence on project success

Metrics

Metrics Loading ...
Published
2011-06-11
Section
Articles