Scheduling Flexible Manufacturing System with Stacker Crane Using Coloured Petri Nets
Abstract
Scheduling Flexible Manufacturing System (FMS) can increase production speed and accuracy. It because FMS has an ability to process various variety of product at same work station. However, FMS need efficient allocation of resources, for example: allocation of material handling equipment. This paper presents production scheduling FMS modelling to 24 jobs and 4 machines considering stacker crane. Coloured Petri Nets (CP-Nets) is the programming language which used to simulate model because it’s simplicity. This model consists two main model activities. The first one is Physical Activity (PA) which related to every activity that involve physical movement, including stacker crane processes. PA consist five CP-Nets models: loading/unloading station, stacker crane, machine, picking mechanism, and pallet stocker. The second activity is Logical Expression (LE) which related to the rules on how FMS should operate. LE consist three CP-Nets models: machine selection, pick-up request, and stage two procedure. A simulation and numerical report show utilization level of all machines around 80-84% and stacker crane 8,74%.ÂMetrics
References
Setiawan, A., Qashmal L., Wangsaputra, R., Martawirya, Y. Y., Halim, A. H. 2016. An object-oriented Modelling of Production Scheduling for Flexible Manufacturing System. Bandung: Institut Teknologi Bandung.
Jensen, K., Kristensen, L.M. 2009. Coloured Petri Nets: Modelling and Validation of Concurrent Systems. Denmark: Springer-Verlag Berlin Heidelberg.
Kusuma, A.C. 2016. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System menggunakan Metode Genetic Algorithm. Bandung: Institut Teknologi Harapan Bangsa.
Surya, T. 2016. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System Menggunakan Metode Ant Colony Optimization. Bandung: Institut Teknologi Harapan Bangsa.
Suhendi, A. 2017. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System Menggunakan Metode Ant Colony Optimization Dengan Faktor Umur Cutting Tools. Bandung: Institut Teknologi Harapan Bangsa.
Kurniawan, R. 2017. Pendekatan Object-Oriented Modelling Untuk Penjadwalan Produksi Yang Memperhatikan Cutting Tools Lifetime Pada Flexible Manufacturing System. Bandung: Institut Teknologi Harapan Bangsa.
Shivanand, H.K., Benal, M. M., Koti, V. 2006. Flexible Manufacturing System. New Delhi: New Age International (P) Limited, Publishers.
Dicesare, F., Harhalakis, G., Proth, J.-M., Silva-Suarez, M., Vernadat, F. 1993. Practice of Petri Nets in Manufacturing. Netherlands: Springer.
Conway, Richard W. 1967. Theory of Scheduling. Massachusett: Addison Wesley Publishing Co.
Baker, K.R. 1974. Introduction To Sequencing and Scheduling. New York: John Wiley and Sons.
Biegel, J.E. 1992. Production Control. New York: Prentice-Hall. Inc.
Vollman, T. E., Whybark, Lee B.W. 1998. Manufacturing Planning & Control System, 4th Edition. McGraw-Hill Trade.
Narshimhan, S.L., McLeavey, D.W., Billington, P.J. 1985. Production Planning and Inventory Control, 2nd Edition. Prentice-Hall International.
Bedworth, David D., Bailey, James Edward. 1987. Integrated Production Control System Management, Analysis, and Designs. Singapore: John Wiley and Sons.
Ullman, J. D. 1993. Elements of ML Programming. Prentice-Hall
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
Â